SIBANYE STILLWATER LIMITED - Results for the six months ended 30 June 2024 - Short form announcement

Release Date: 12/09/2024 12:00
Code(s): SSW     PDF:  
Wrap Text
Results for the six months ended 30 June 2024 - Short form announcement

Sibanye Stillwater Limited
Incorporated in the Republic of South Africa
Registration number 2014/243852/06
Share codes: SSW (JSE) and SBSW (NYSE)
ISIN - ZAE000259701
Issuer code: SSW
('Sibanye-Stillwater','the Company' and/or 'the Group')

Registered Address:
Constantia Office Park
Bridgeview House - Building 11 - Ground Floor
Cnr 14th Avenue & Hendrik Potgieter Road
Weltevreden Park - 1709

Postal Address:
Private Bag X5 - Westonaria - 1780

Tel +27 11 278 9600 - Fax +27 11 278 9863

Website: www.sibanyestillwater.com

MARKET RELEASE

Results for the six months ended 30 June 2024 - Short form announcement

JOHANNESBURG, 12 September 2024: Sibanye-Stillwater (JSE: SSW and NYSE: SBSW) is pleased to report operating and financial results for the six
months ended 30 June 2024.

Please note: there is price sensitive information in the H1 2024 results presentation which is not provided in this results document. The presentation
will be available at H1 2024 results download link from 14h00 (CAT) / 13h00 (GMT) / 08h00 (EST) / 06h00 (MT). The webcast of the presentation
can also be accessed at Webcast link.

SALIENT FEATURES FOR THE SIX MONTHS ENDED 30 JUNE 2024

-        Continued focus on safety results in ongoing risk reduction and best ever Group safety indicators recorded during H1 2024
-        Lower commodity prices drive 9% decline in revenue to R55.2bn (US$2.9bn)1
-        Loss for the period of R7.1bn (US$0.4bn) includes non-cash impairments of R7.5bn (US$0.4bn)1
-        Strong financial position maintained with 1.43x net debt: adjusted EBITDA14 well below covenant limits
-        Balance sheet strengthened through non-debt financing initiatives, with further financing in advanced stages
-        Decisive steps taken to optimise operations in the short and medium term
-        Low PGM prices lead to additional restructuring of US PGM operations, reducing 2E production by 200,000 2Eoz to cut costs
-        Benefits of restructuring of SA gold operations and central services expected from H2 2024
-        SA PGM operations deliver solid operational performance and positive free cash flow
-        Keliber lithium project fully funded through €500m green financing

1 Based on the average exchange rate of R18.72/US$ for the six months ended 30 June 2024 from EquityRT

KEY STATISTICS - GROUP

                       US dollar                                                                                                           SA rand
                   Six months ended                                                                                                    Six months ended
      Jun 2023         Dec 2023        Jun 2024                                  KEY STATISTICS                             Jun 2024       Dec 2023        Jun 2023
                                                                                     GROUP
           407           (2,458)           (397)   US$m                          Basic earnings                       Rm      (7,472)       (45,195)          7,423
           324             (227)              7    US$m                        Headline earnings                      Rm         137         (4,107)          5,891
           776              340             355    US$m                       Adjusted EBITDA1,14                     Rm       6,648          6,409          14,147
           427           (2,459)           (379)   US$m                   (Loss)/profit for the period                Rm      (7,138)       (45,216)          7,786
          18.21           18.62           18.72    R/US$         Average exchange rate using daily closing rate

KEY STATISTICS BY REGION

                      US dollar                                                                                                            SA rand
                  Six months ended                                                                                                     Six months ended
      Jun 2023        Dec 2023        Jun 2024                                   KEY STATISTICS                            Jun 2024        Dec 2023        Jun 2023
                                                                                AMERICAS REGION
                                                                         US PGM underground operations
       205,513         221,759         238,139     oz                        2E PGM production2,3                     kg      7,407           6,897           6,392
         1,390           1,124             977     US$/2Eoz                  Average basket price                 R/2Eoz     18,289          20,928          25,312
            53             (18)             27     US$m                       Adjusted EBITDA14                       Rm        488            (266)            976
         1,737           1,992           1,343     US$/2Eoz               All-in sustaining cost4,14              R/2Eoz     25,149          37,090          31,633
                                                                              US PGM recycling
       162,452         147,862         154,938     oz                         3E PGM recycling2,3                     kg      4,819           4,599           5,053
         2,735           1,939           1,252     US$/3Eoz                  Average basket price                 R/3Eoz     23,437          36,105          49,804
            20              13               8     US$m                       Adjusted EBITDA14                       Rm        147             236             371
                                                                            US Reldan operations5 
                                          0.32     US$m                       Adjusted EBITDA14                       Rm          6
                                                                          SOUTHERN AFRICA (SA) REGION
                                                                               PGM operations                    
       799,182         873,745         828,460     oz                       4E PGM production3,6,7                    kg     25,768          27,177          24,857
         1,867           1,304           1,309     US$/4Eoz                  Average basket price                 R/4Eoz     24,499          24,276          34,006                  
           649             309             255     US$m                       Adjusted EBITDA14                       Rm      4,766           5,826          11,794                   
         1,083           1,094           1,150     US$/4Eoz               All-in sustaining cost4,14              R/4Eoz     21,533          20,363          19,716
                                                                               Gold operations
       416,738         393,847         344,109     oz                           Gold produced                         kg     10,703          12,250          12,962
         1,921           1,955           2,205     US$/oz                     Average gold price                    R/kg  1,327,000       1,170,362       1,124,871                 
           130              63             117     US$m                       Adjusted EBITDA14                       Rm      2,201           1,148           2,375                 
         1,813           2,008           2,078     US$/oz                 All-in sustaining cost4,14                R/kg  1,250,647       1,202,225       1,061,477
                                                                               EUROPEAN REGION
                                                                         Sandouville nickel refinery                
         3,493           3,632           4,270     tNi                        Nickel production8                     tNi      4,270           3,632           3,493                            
        26,888          21,075          20,309     US$/tNi         Nickel equivalent average basket price9         R/tNi    380,190         392,420         489,635
           (35)            (37)            (15)    US$m                       Adjusted EBITDA14                       Rm       (280)           (701)           (627)         
        37,486          33,492          23,684     US$/tNi          Nickel equivalent sustaining cost10,14         R/tNi    443,366         623,615         682,628
                                                                              AUSTRALIAN REGION
                                                                     Century zinc retreatment operation11
            24              51              42     ktZn                 Zinc metal produced (payable)12             ktZn         42              51              24
         1,640           1,766           2,366     US$/tZn        Average equivalent zinc concentrate price13      R/tZn     44,297          32,878          29,871
           (28)             13             (19)    US$m                       Adjusted EBITDA14                       Rm       (351)            217            (502)      
         2,418           1,759           2,228     US$/tZn               All-in sustaining cost4,14                R/tZn     41,710          32,746          44,030
   
1. The Group reports adjusted earnings before interest, taxes, depreciation and amortisation (EBITDA) based on the formula included in the facility agreements for
compliance with the debt covenant formula. Adjusted EBITDA may not be comparable to similarly titled measures of other companies. Adjusted EBITDA is not a measure
of performance under IFRS and should be considered in addition to and not as a substitute for any other measure of financial performance and liquidity. For a 
reconciliation of profit before royalties and tax to adjusted EBITDA, see note 11.1 of the condensed consolidated financial statements

2. The US PGM operations' underground production is converted to metric tonnes and kilograms, and performance is translated to SA rand (rand). In addition to the 
US PGM operations' underground production, the operation treats various recycling material which is excluded from the 2E PGM production, average basket price and 
All-in sustaining cost statistics shown. PGM recycling represents palladium, platinum and rhodium ounces fed to the furnace

3. The Platinum Group Metals (PGM) production in the SA operations is principally platinum, palladium, rhodium and gold, referred to as 4E (3PGM+Au), and in the 
US underground operations is principally platinum and palladium, referred to as 2E (2PGM) and US PGM recycling is principally platinum, palladium and rhodium 
referred to as 3E (3PGM)

4. See 'Salient features and cost benchmarks - Six months ' for the definition of All-in sustaining cost (AISC). The SA PGM All-in sustaining cost excludes the 
production and costs associated with the purchase of concentrate (PoC) from third parties
 
5. The acquisition of the Reldan Group of Companies (Reldan) was concluded on 15 March 2024. The six months ended 30 June 2024 include the results since 
acquisition. All salient features for the US Reldan operations are shown separately from the US PGM underground operations and the US PGM recycling
    
6. The SA PGM production excludes the production associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the production and 
third party PoC, refer to the 'Reconciliation of operating cost excluding third party PoC for US and SA PGM operations, Total SA PGM operations and Marikana - Six months'
    
7. As previously announced, Sibanye Rustenburg Platinum Mines Limited had entered into a pool and share agreement to acquire Rustenburg Platinum Mines Limited 50% 
ownership of Kroondal. The acquisition became effective on 1 November 2023 after all conditions precedent had either been met or waived, therefore from 
1 November 2023 the SA PGM operations includes 100% Kroondal
    
8. The nickel production at the Sandouville refinery operations is principally nickel metal and nickel salts (liquid form), together referred to as nickel equivalent products
    
9. The nickel equivalent average basket price per tonne is the total nickel revenue adjusted for other income less non-product sales divided by the total nickel 
equivalent tonnes sold
    
10. See 'Salient features and cost benchmarks - Six months' Sandouville nickel refinery for a reconciliation of cost of sales before amortisation and depreciation 
to nickel equivalent sustaining cost
    
11. The Century zinc tailings retreatment operation is a leading tailings management and rehabilitation operation in Queensland, Australia. The Century operation 
was acquired by the Group on 22 February 2023 and amounts included since effective date of acquisition
    
12. Zinc metal produced (payable) is the payable quantity of zinc metal produced after applying smelter content deductions
    
13. Average equivalent zinc concentrate price is the total zinc sales revenue recognised at the price expected to be received excluding the fair value adjustments 
divided by the payable zinc metal sold
    
14. Adjusted EBITDA, All-in sustaining cost (AISC) and nickel equivalent sustaining cost are not measures of performance under IFRS and should not be considered in 
isolation or as substitutes for  measures of financial performance prepared in accordance with IFRS. See 'Non-IFRS measures' in the operating and financial results 
booklet for the six months ended 30 June 2024 for more information the Non-IFRS metrics presented by Sibanye-Stillwater

STATEMENT BY NEAL FRONEMAN, CHIEF EXECUTIVE OF SIBANYE-STILLWATER

Considerable progress was made during the six-month period ended 30 June 2024 (H1 2024) to secure the sustainability of our operations through
the current low-price environment, and to optimise operational cashflow to protect the integrity of our balance sheet while retaining leverage to a
recovery in the commodity price cycle.

The Group maintained a sound financial position with undemanding balance sheet leverage of 1.43x net debt: adjusted EBITDA at 30 June 2024
well below our covenant levels. We have proactively reinforced the Group balance sheet through a series of financial transactions since June
2024, which have resulted in additional debt headroom (before approaching our leverage covenants) of approximately R25 billion, and
significantly enhanced balance sheet liquidity and flexibility.

The actions we have taken have been decisive and are evidenced by reduced costs and improved profitability at most of our operations during
H1 2024 compared with H1 2023, with the full cost benefits from recent restructuring in the SA region expected to materialise in coming periods.
Further restructuring of the US operations for the lower PGM price environment will be undertaken, and with the GalliCam project assessing the
potential for repurposing the Sandouville refinery for sustainability through the production of precursor active material (pCAM).

The extended period of low commodity prices (with the notable exception of gold) and persistent cost inflation, has continued to squeeze margins
and reduce earnings and cash flows for the global mining industry.

The Group's financial results for H1 2024 reflect the low prevailing commodity price environment, with Group profitability lower year on year,
primarily due to the material decline in PGM prices.

Group adjusted EBITDA declined by 53% to R6.6 billion (US$355 million), with the SA PGM operations, which experienced a R7.0 billion or 60%
decline in adjusted EBITDA to R4.8 billion, accounting for 94% of this decline. Other than the US PGM operations and US PGM recycling operations,
which were also impacted by lower PGM basket prices year-on-year, the financial performance of the other Group operations improved year-on-
year, with an improved operational performance from the Sandouville refinery reducing adjusted EBITDA losses and the SA gold and Century zinc
operations benefiting from higher prices. The restructuring actions taken at the US PGM operations and SA region operations, resulted in Group free
cash flow improving by R797 million relative to H2 2023.

The Group reported a loss of R7.1 billion (US$379 million) (after tax) for H1 2024 compared with a profit of R7.8 billion (US$427 million) for H1 2023,
including a R7.6 billion (US$407 million) impairment of the US PGM operations made due to 5-8% lower consensus palladium prices utilised for fair
value calculation purposes. As a result, a basic loss per share (EPS) of 264c with headline earnings per share (HEPS) of 5c is reported for H1 2024
compared with EPS of 264c and HEPS of 208c for H1 2023.

Despite negative free cash flow of R7.3 billion (US$391 million) for the period, the Group financial position remained solid, with the net debt:
adjusted EBITDA ratio of 1.43x being well within comfort levels. Although net debt increased by R6.8 billion (US$367 million) (borrowings of R34.2
billion (US$1.9 billion) and cash and cash equivalents of R15.5 billion (US$844 million)) the primary reason for the increase in leverage from 0.58x at
the end of H2 2023 was the decline in the 12 month trailing adjusted EBITDA to R13.1 billion (US$0.7 billion).

STRATEGIC DELIVERY- FOCUSED ON OUR STRATEGIC ESSENTIALS

Our fundamental position regarding the longer-term outlook for the metals we produce and battery metals we will produce remains unchanged,
with a considered and measured strategic response to the cyclical downturn in commodity prices. Our strategic focus is to ensure consistency
through price cycles and our decisions are not taken based on short-term factors.

We are confident that our strategic interventions to secure operational sustainability and protect our Balance sheet will ensure that the Group will
not only prevail through the current low-price cycle, but emerge exceptionally well positioned to benefit from a recovery in metal prices. Our
strategy remains relevant and appropriate, and we are confident that we are well positioned for longer-term value creation.

As such, we have continued to invest in the development of the Keliber lithium project (perhaps somewhat counter cyclically during a period of
oversupply, as expressed by some observers) to ensure that we are strategically positioned to supply locally produced Lithium Hydroxide (LiOH)
necessary for the future development of the battery electric vehicle (BEV) sector in Europe. Despite the current oversupply of lithium, even under
more moderate BEV growth assumptions than current market consensus, our analysis suggests that demand for lithium will continue to rise
significantly. With permitting and financing of new mining projects becoming more challenging and costly, we believe that future demand will
outstrip the increase in new supply of lithium required to support the projected growth resulting in increasing deficits over the latter half of this
decade. Moreover, with current low prices being a disincentive to the development of new projects, we remain confident that we will be suitably
positioned to deliver production from the Keliber lithium project into the growing deficit market.

While the Group Balance sheet at the end of H1 2024 remained healthy with leverage undemanding, in the current uncertain macro-economic
environment we retain the prudent approach outlined in the 2023 results presentation in February 2024 to proactively mitigate increases in net
debt until positive cashflow from operations is restored.

In June 2024, following proactive engagement with our lenders, the leverage covenant limit for all Group facilities was uplifted to 3.5x until 30 June
2025 and to 3.0x until 31 December 2025 provides significant financial headroom and reduces financial risk. Assuming adjusted EBITDA of R13 billion
(H1 2024 annualised), the covenant uplift to 3.5x provides implied additional net debt headroom of R13 billion until July 2025 and R6.5 billion to the
end of December 2025. Other Balance sheet protection measures announced by the Group post the end of H1 2024 have further reinforced the
Group Balance sheet and significantly improved financial liquidity and flexibility. These include:

-       Refinancing and upsizing the rand revolving credit facility (RCF), which was due to mature on 11 November 2024, from R5.5 billion to R6.0 billion
        is a strong signal of confidence and support from our South African lenders.

-       The first alternative non debt financing transaction was concluded in August 2024. A gold prepayment arrangement for delivery of 1,497
        kilograms (48,129oz) of gold in equal monthly tranches from October 2024 to November 2026 has secured the Group a minimum of R1.8bn
        (US$100 million) in non-debt financing while providing upside exposure to higher gold prices.

-       The Group is also in advanced stages of securing US$600 million to US$ 700 million additional non debt financing through potential prepays and
        streams (chrome, gold, PGM) in the SA region.

Underpinning the Balance sheet strengthening measures, the cost benefits from operational restructuring implemented since 2022, are beginning
to come through in improved financial and operating results for most of the Group operations, preserving cash flow through the current low-price
environment.

Further to the expected cost and capital savings (the anticipated benefits outlined in February 2024 have been confirmed with an increased
value of R6.6 billion (US$375 million)) and capital reductions and/or deferrals, which were detailed in the H2 2023 operating and financial results in
February 2024, additional annual cost and efficiency benefits of R461 million (US$26.5 million) are expected from the recently concluded
restructuring of the Kloof 2 Plant and realignment of the SA region services functions to the reduced operational footprint in the SA region. In
comparison to the 2022 cost base, the gross expected benefit from the actions taken to date is therefore expected to be R7 billion (US403 million).

The SA PGM operations delivered another solid performance, increasing production and generating positive free cashflow for H1 2024. Lower
production from the restructuring of loss-making shafts (two of which were closed and two restructured), as well as reduced production from
Siphumelele shaft as a result of the shaft bin failure and at Kroondal due to the illegal industrial action, was more than offset by the consolidation
of an additional 50% of Kroondal production following the acquisition of Anglo American Platinum Corporation Ltd's (Anglo American Platinum)
50% shareholding in November 2023, resulted in a 4% production (excluding PoC) increase to 828,460 4Eoz, with AISC 9% higher year-on-year to
R21,533/4Eoz (US$1,150/4Eoz) (excluding PoC cost). A 28% decline in the average 4E PGM basket price however resulted in adjusted EBITDA
declining by 60% to R4.8 billion (US$255 million). Free cash flow of R849 million (US$45 million) reflects a strong recovery from a negative adjusted
free cash flow of R263 million (US$14 million) for H1 2023. Further cost benefits from restructuring in the SA region are expected to emerge in coming
periods, further underpinning cash flow.

Gold production from the SA gold operations of 10,703kg (344,109oz) for H1 2024 was 17% lower than for H1 2023 with AISC of R1,251k/kg
(US$2,078/oz), 18% higher, primarily due to cessation of production from Kloof 4 shaft during 2023 but with some costs still being incurred during Q1
2024 due to the phased closure process. Adjusted EBITDA from the SA gold operations of R2.2 billion (US$117 million) was 7% lower than for H1 2023,
but 92% higher than for H2 2023, with comparisons strongly influenced by the closure of Kloof 4 shaft. Free cash flow improved by R1.2 billion
compared with H2 2023.

The operating performance of the Sandouville refinery was significantly improved as a result of improved circuit availability and production stability
following repairs to the cathode units in the electro winning circuit in mid-2023 and other improvements to the plant. Nickel production of 4,270tNi
was 22% higher than for H1 2023, with nickel equivalent sustaining cost declining by 37% to US$23,684/tNi (R443,366/tNi), primarily due to reduced
feedstock purchase costs (lower nickel price), and lower reagent and overhead costs. Due to these cost and volume improvements and inventory
movement benefits during Q1 2024, the adjusted EBITDA loss for H1 2024 of US$15 million (R280 million) was 57% lower than for H1 2023.
The Century zinc tailings retreatment operation in Queensland Australia was disrupted by adverse weather in Q1 2024, and cash flows were
impacted by scheduled maintenance on trans-shipment vessels during H1 2024. With production normalising from Q2 2024 and sales of stockpiled
concentrate in July and August, cashflow should be strong for the remainder of the year. Although zinc metal produced (payable) of 42ktZn and
AISC of US$2,228/tZn were towards the lower end of the H1 contribution to 2024 guidance, with continued strong operations annual guidance
should be achieved. This, coupled with the increase in the zinc price and significantly lower annual benchmark treatment charges (US$165/tonne
in 2024 vs US$274/tonne in 2023), has improved the outlook and the Century operations are expected to contribute positively to Group adjusted
EBITDA.

The restructuring (repositioned for lower production and cost) undertaken during Q4 2023 at the US PGM operations resulted in a significantly
improved performance for H1 2024 compared with H1 2023. Mined 2E production was 16% higher than for H1 2023 and 7% higher than for H2 2023,
with AISC declining by 23% year-on-year to US$1,343/2Eoz (R25,149/2Eoz), within guidance for 2024 and the best operational performance since H1
2021. PGM prices have remained under pressure during 2024 however, with the average 2E PGM basket price received for H1 2024, 30% lower
year-on-year, resulting in adjusted EBITDA (excluding the US$43 million (R812 million) insurance claim related to the 2022 flood) of negative US$16
million (R306 million), compared with positive US$53 million (R976 million) for H1 2023.

Despite the positive production and cost outcomes, the 2E PGM basket price during 2024 has remained at levels some US$300 - 400/oz below the
average AISC for H1 2024 and reducing unit cost to achieve profitability at current prices is not possible without increased capital investment in
production growth. The capital investment required is not feasible at current PGM prices and as a result, further restructuring of the US PGM
operations is necessary to reduce cash outflows while ensuring the sustainability of the Columbus autocatalyst recycling operation. The
restructuring is likely to result in sustainable 2E production from the US PGM operations reducing by approximately 200,000 2Eoz (relative to 2024
guidance), with a consequent reduction in the workforce. A fundamental review of the mine operations to reduce AISC to approximately
US$1,000/2Eoz will then follow.

The measures taken have ensured that the Group is well positioned, not only to endure through this period of low commodity prices, but with
improved optionality and leverage to a turn in the commodity price cycle, which will support ongoing value creation and strategic delivery.
Further detail will be provided in the presentation available at H1 2024 results download link. The slides will also be discussed during the webcast at
14h00 (CAT) / 13h00 (GMT) / 08h00 (EST) / 06h00 (MT), available at Webcast link.

KEY FINANCIAL RESULTS

              US dollar                                                                                                       SA rand
         Six months ended                                                                                                Six months ended
   Jun 2023   Dec 2023    Jun 2024                                   KEY STATISTICS                                Jun 2024   Dec 2023    Jun 2023
                                                                          GROUP
      3,326      2,846       2,949                                 Revenue (million)                                 55,204     53,116      60,568
         14        (86)        (14)                              Basic earnings (cents)                                (264)    (1,597)        262
         11         (8)          -                             Headline earnings (cents)                                  5       (145)        208

DIVIDEND DECLARATION

In line with Sibanye-Stillwater's dividend policy and Capital Allocation Framework, the Board of Directors resolved not to declare an interim
dividend for 2024 (2023: 53 SA cents per share). No final dividend was declared for 2023. The 2023 interim dividend amounted to a payout of 35%
of normalised earnings for the six months ended 30 June 2023.

This short-form announcement is the responsibility of the board of directors of the Company (Board).

The information disclosed is only a summary and does not contain full or complete details. Any investment decisions by investors and/or
shareholders should be based on a consideration of the full financial results for the six months ended 30 June 2024 (results booklet) as a whole and
shareholders are encouraged to review the results booklet, which is available for viewing on the Company's website at https://
www.sibanyestillwater.com/news-investors/reports/quarterly/2024/ and via the JSE at 
https://senspdf.jse.co.za/documents/2024/jse/isse/sswe/HY24Result.pdf.


Contact:

Email: ir@sibanyestillwater.com
James Wellsted
Executive Vice President: Investor Relations and Corporate Affairs
+27(0)83 453 4014
Website: www.sibanyestillwater.com

Sponsor: J.P. Morgan Equities South Africa Proprietary Limited

DISCLAIMER

FORWARD LOOKING STATEMENTS

The information in this announcement may contain forward-looking statements within the meaning of the 'safe harbour' provisions of the United
States Private Securities Litigation Reform Act of 1995. These forward-looking statements, including, among others, those relating to Sibanye
Stillwater Limited's (Sibanye-Stillwater or the Group) financial positions, business strategies, business prospects, industry forecasts, production and
operational guidance, climate and ESG-related targets and metrics, plans and objectives of management for future operations, are necessarily
estimates reflecting the best judgment of the senior management and directors of Sibanye-Stillwater and involve a number of risks and
uncertainties that could cause actual results to differ materially from those suggested by the forward-looking statements. As a consequence, these
forward-looking statements should be considered in light of various important factors, including those set forth in this announcement.

All statements other than statements of historical facts included in this report may be forward-looking statements. Forward-looking statements also
often use words such as 'will', 'would', 'expect', 'forecast', 'potential', 'may', 'could', 'believe', 'aim', 'anticipate', 'target', 'estimate' and
words of similar meaning. By their nature, forward-looking statements involve risk and uncertainty because they relate to future events and
circumstances and should be considered in light of various important factors, including those set forth in this disclaimer. Readers are cautioned not
to place undue reliance on such statements. The important factors that could cause Sibanye-Stillwater's actual results, performance or achievements to 
differ materially from estimates or projections contained in the forward-looking statements include, without limitation, Sibanye-Stillwater's future 
financial position, plans, strategies, objectives, capital expenditures, projected costs and anticipated cost savings, financing plans, debt position 
and ability to reduce debt leverage; economic, business, political and social conditions in South Africa, Zimbabwe, the United States, Europe and elsewhere;
plans and objectives of management for future operations; Sibanye-Stillwater's ability to obtain the benefits of any streaming arrangements or pipeline financing;
the ability of Sibanye-Stillwater to comply with loan and other covenants and restrictions and difficulties in obtaining additional financing or
refinancing; Sibanye-Stillwater's ability to service its bond instruments; changes in assumptions underlying Sibanye-Stillwater's estimation of its
Mineral Resources and Mineral Reserves; any failure of a tailings storage facility; the ability to achieve anticipated efficiencies and other cost
savings in connection with, and the ability to successfully integrate, past, ongoing and future acquisitions, as well as at existing operations; the
ability of Sibanye-Stillwater to complete any ongoing or future acquisitions; the success of Sibanye-Stillwater's business strategy and exploration
and development activities, including any proposed, anticipated or planned expansions into the battery metals or adjacent sectors and
estimations or expectations of enterprise value (including the Rhyolite Ridge project); the ability of Sibanye-Stillwater to comply with requirements
that it operate in ways that provide progressive benefits to affected communities; changes in the market price of gold, PGMs, battery metals (e.g.,
nickel, lithium, copper and zinc) and the cost of power, petroleum fuels, and oil, among other commodities and supply requirements; the
occurrence of hazards associated with underground and surface mining; any further downgrade of South Africa's credit rating; the impact of
South Africa's greylisting; a challenge regarding the title to any of Sibanye-Stillwater's properties by claimants to land under restitution and other
legislation; Sibanye-Stillwater's ability to implement its strategy and any changes thereto; the outcome of legal challenges to the Group's mining or
other land use rights; the occurrence of labour disputes, disruptions and industrial actions; the availability, terms and deployment of capital or
credit; changes in the imposition of industry standards, regulatory costs and relevant government regulations, particularly environmental,
sustainability, tax, health and safety regulations and new legislation affecting water, mining, mineral rights and business ownership, including any
interpretation thereof which may be subject to dispute; the outcome and consequence of any potential or pending litigation or regulatory
proceedings, including in relation to any environmental, health or safety issues; failure to meet ethical standards, including actual or alleged
instances of fraud, bribery or corruption; the effect of climate change or other extreme weather events on Sibanye-Stillwater's business; the
concentration of all final refining activity and a large portion of Sibanye-Stillwater's PGM sales from mine production in the United States with one
entity; the identification of a material weakness in disclosure and internal controls over financial reporting; the effect of US tax reform legislation on
Sibanye-Stillwater and its subsidiaries; the effect of South African Exchange Control Regulations on Sibanye-Stillwater's financial flexibility; operating
in new geographies and regulatory environments where Sibanye-Stillwater has no previous experience; power disruptions, constraints and cost
increases; supply chain disruptions and shortages and increases in the price of production inputs; the regional concentration of Sibanye-Stillwater's
operations; fluctuations in exchange rates, currency devaluations, inflation and other macro-economic monetary policies; the occurrence of
temporary stoppages or precautionary suspension of operations at its mines for safety or environmental incidents (including natural disasters) and
unplanned maintenance; Sibanye-Stillwater's ability to hire and retain senior management and employees with sufficient technical and/or
production skills across its global operations necessary to meet its labour recruitment and retention goals, as well as its ability to achieve sufficient
representation of historically disadvantaged South Africans in its management positions; failure of Sibanye-Stillwater's information technology,
communications and systems, the impact of cybersecurity incidents or breaches; the adequacy of Sibanye-Stillwater's insurance coverage; social
unrest, sickness or natural or man-made disaster at informal settlements in the vicinity of some of Sibanye-Stillwater's South African-based
operations; and the impact of HIV, tuberculosis and the spread of other contagious diseases, such as the coronavirus disease (COVID-19).

Further details of potential risks and uncertainties affecting Sibanye-Stillwater are described in Sibanye-Stillwater's filings with the Johannesburg
Stock Exchange and the United States Securities and Exchange Commission, including the 2023 Integrated Report and the Annual Financial
Report for the fiscal year ended 31 December 2023 on Form 20-F filed with the United States Securities and Exchange Commission on 26 April 2024
(SEC File no. 333-234096).

These forward-looking statements speak only as of the date of the content. Sibanye-Stillwater expressly disclaims any obligation or undertaking to
update or revise any forward-looking statement (except to the extent legally required). These forward-looking statements have not been reviewed
or reported on by the Group's external auditors.

NON-IFRS MEASURES

The information contained in this announcement may contain certain non-IFRS measures, including, among others, adjusted EBITDA, adjusted
EBITDA margin, adjusted free cash flow, AISC, AIC, Nickel equivalent sustaining cost and normalised earnings. These measures may not be
comparable to similarly-titled measures used by other companies and are not measures of Sibanye-Stillwater's financial performance under IFRS
Accounting Standards. These measures should not be considered in isolation or as a substitute for measures of performance prepared in
accordance with IFRS Accounting Standards. Sibanye-Stillwater is not providing a reconciliation of the forecast non-IFRS financial information
presented in this report because it is unable to provide this reconciliation without unreasonable effort. These forecast non-IFRS financial information
presented have not been reviewed or reported on by the Group's external auditors.

1   IFRS refers to International Financial Reporting Standards Accounting Standards (IFRS Accounting Standards) as issued by the International Accounting Standards Board (IASB)

WEBSITES

References in this document to information on websites (and/or social media sites) are included as an aid to their location and such information is
not incorporated in, and does not form part of, this report.
Date: 12-09-2024 12:00:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.