MC MINING LIMITED - Activities Report for the quarter ended 31 December 2024 (FY2025 Q2)

Release Date: 31/01/2025 10:45
Code(s): MCZ     PDF:  
Wrap Text
Activities Report for the quarter ended 31 December 2024 (FY2025 Q2)

MC Mining Limited
Previously Coal of Africa Limited
(Incorporated and registered in Australia)
Registration number ABN 008 905 388
ISIN AU000000MCM9
JSE share code: MCZ
ASX/AIM code: MCM

ANNOUNCEMENT                                                                

31 January 2025

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 December 2024 (FY2025 Q2) FOR MC MINING LIMITED (MC Mining or the Company)
AND ITS SUBSIDIARY COMPANIES

HIGHLIGHTS
Operations

•   Health and safety continues to be a priority, with the goal being to achieve zero harm. The Group
    recorded zero fatalities (FY2025 Q1: one) and one lost-time injury (LTI) (FY2025 Q1: one LTI) during
    the quarter;

•   Run-of-mine (ROM) coal production at the Uitkomst steelmaking and thermal coal mine
    (Uitkomst Colliery or Uitkomst) was 26% lower than the December 2023 quarter at 95,489 tonnes
    (t) (FY2024 Q2: 129,272t);

•   Uitkomst sold 61,195t of high-grade coal during the quarter (FY2024 Q2: 102,266t) and 4,276t
    sales of lower grade middlings coal (FY2024 Q2: nil);

•   Progress was made on select early works activities at the Makhado steelmaking hard coking coal
    project (Makhado Project or Makhado), along with order placements being made for long lead
    items for the coal handling and processing plant (CHPP) and related infrastructure;

•   Limited activities were undertaken at the Company's Vele Aluwani semi-soft coking and thermal
    coal colliery (Vele Colliery or Vele) and Greater Soutpansberg Projects (GSP); and

• Depressed thermal coal prices continued with average prices of US$110/t for the three months,
    compared to US$110/t in Q1 FY2025 and US$116/t in Q2 of FY2024. Premium steelmaking hard
   coking coal (HCC) prices have decreased, averaging US$206/t in the quarter compared to US$335/t
   in FY2024 Q2.




Corporate

• Available cash and facilities of US$4 million at the period end (FY2025 Q1: US$10.8 million); and

• On 13 December 2024, the Competition Commission issued a Merger Clearance Certificate for the
   proposed transaction with Kinetic Development Group Limited (KDG) (reference is made to the
   Company's announcement of 28 August 2024 for more details on the proposed transaction) with
   conditions.



Events subsequent to the end of the quarter

• Fulfilment of the key condition to the Second Close occurred, as defined in the Share Subscription
   Agreement, being that MC Mining's shareholders passed a resolution approving the Second Closing
   by the majorities required under the Australian Corporations Act 2001 (the Corporations Act). The
   resolution was passed on 23 January 2025; and

• The Industrial Development Corporation of South Africa Limited extended the date for repayment
   of the R160 million loan plus interest thereon, to 30 June 2025, on condition that the Company
   make a payment of ZAR10,000,000 to the IDC. The repayment of the loan, plus accrued interest,
   was due for repayment by 30 September 2024.



DETAILED QUARTERLY OPERATIONS REPORTS
Uitkomst Colliery – Utrecht Coalfields (84% owned)
Uitkomst recorded zero fatalities (FY2025 Q1: one) and one lost-time injury (LTI) (FY2025 Q1: one LTI)
during the quarter.


Uitkomst produced 95,489t of ROM coal during the quarter (FY2024 Q2: 129,272t). The 26% decrease
in ROM coal production is due to unfavorable geological conditions and underground equipment
availability challenges during the period.


During the quarter, Uitkomst sold 61,195t (FY2024 Q2: 102,266t) of high-grade duff and peas coal.
The colliery also sold a further 4,276t of middlings coal during the three months (FY2024 Q2: nil). The
colliery had 1,799t (FY2024 Q2: 14,422t) of high-grade coal inventory at the end of December 2024.


The production costs per saleable tonne were 70% higher than the comparative period (FY2025 Q2:
US$88/t vs. FY2024 Q2: US$52/t). The decline in production volumes resulted in the increase of the
production costs.


                                                    Quarter to           Quarter to
                                                      end-Dec              end-Dec
                                                         2025                 2024               %?
   Production volumes
   Uitkomst ROM (t)                                    95,489               129,272            (26%)

   Inventory volumes
   High quality duff and peas (t)                       1,799                14,422            (88%)

   Sales tonnages
   High quality duff and peas (t)                      61,195               102,266            (40%)
   Middlings sales (t)                                  4,276                     -            100%
                                                       65,471               102,266            (36%)
   Quarter financial metrics
   Net revenue/t (US$)                                     70                     74            (5%)
   Net revenue/t (ZAR)                                  1,226                  1,390           (10%)
   Production cost/saleable tonne (US$)^                   88                     52             70%
      ^ costs are all South African Rand (ZAR) based


Makhado Hard Coking Coal Project – Soutpansberg Coalfield (67% owned)
The development of the Company's flagship fully licensed and shovel-ready Makhado Project is
expected to position MC Mining as South Africa's pre-eminent steelmaking HCC producer. Makhado
recorded no LTIs (FY2025 Q1: nil) during the quarter.


The Makhado Project remains a significant strategic asset for the Company that has the potential to
take the Company's production profile to more than 800,000 tonnes per annum of steelmaking HCC
and will generate significant returns for shareholders. Funding and development activities for
Makhado are ongoing.

Select early works continued on site at the Makhado Project, with the erecting of power supply lines
ongoing, commencement of construction of a temporary bridge across the Mutamba River to provide
access for construction works and the commencement of bulk earthworks related to the coal handling
and preparation plant (CHPP) terrace. Environmental and Process Technologies Proprietary Limited
(Enprotec), continued with the detailed designing of the CHPP, along with early order placements for
long-lead items related to the CHPP.


Vele Aluwani Semi-Soft Coking and Thermal Coal Colliery – Limpopo (Tuli) Coalfield (100% owned)


Operations at Vele remain suspended. Vele recorded no LTIs (FY2025 Q1: nil) during the quarter.



Greater Soutpansberg Project (GSP) – Soutpansberg Coalfield (74% owned)

The Greater Soutpansberg Projects recorded no LTIs (FY2025 Q1: nil) during the quarter and no
reportable activities occurred during the period. The studies required for the environmental and water
use licences are expected to commence during H1 CY2025.


Appendix 5B – Quarterly Cash Flow Report
The Company's available cash balance and facilities as at 31 December 2024 was US$4 million. The
aggregate amount of payments to related parties and their associates, as disclosed as item 6.1 of the
December 2024 quarter Appendix 5B, was US$50k, comprising executive and non-executive director
remuneration.

A copy of the Appendix 5B can be found here: https://senspdf.jse.co.za/documents/2025/jse/isse/mcze/Q225.pdf


Christine He
Interim Managing Director and Chief Executive Officer
This announcement has been approved by the Company's Disclosure Committee.
All figures are in South African rand or United States dollars unless otherwise stated.


For more information contact:
    Bill Pavlovski                    Company                  Vision Corporate             bill.pavlovski@mcmining.co.za
                                      Secretary                (Pty) Ltd
    Company advisers:
    Marion Brower                     Financial PR             R&A Strategic                +27 11 880 3924
                                      (South                   Communications
                                      Africa)

    BSM Sponsors Proprietary Limited is the nominated JSE Sponsor


       About MC Mining Limited:

       MC Mining is an ASX/JSE-listed coal exploration, development and mining company operating in South Africa. MC
       Mining's key projects include the Uitkomst Colliery (metallurgical and thermal coal), Makhado Project (hard coking
       coal), Vele Colliery (semi-soft coking and thermal coal), and the Greater Soutpansberg Projects (coking and thermal
       coal).

       All figures are denominated in United States dollars unless otherwise stated. Safety metrics are compared to the
       preceding quarter while financial and operational metrics are measured against the comparable period in the
       previous financial year. A copy of this report is available on the Company's website, www.mcmining.co.za.
       Forward-looking statements

       This Announcement, including information included or incorporated by reference in this Announcement, may
       contain "forward-looking statements" concerning MC Mining that are subject to risks and uncertainties. Generally,
       the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions
       identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could
       cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks
       and uncertainties relate to factors that are beyond MC Mining's ability to control or estimate precisely, such as future
       market conditions, changes in regulatory environment and the behaviour of other market participants. MC Mining
       cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is
       cautioned not to place undue reliance on these forward-looking statements. MC Mining assumes no obligation and
       does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein,
       whether as a result of new information, future events or otherwise, except to the extent legally required.
   Statements of intention

   Statements of intention are statements of current intentions only, which may change as new information becomes
   available or circumstances change.




Tenements held by MC Mining and its Controlled Entities
                                                                                                     Change
 Project                                                                                               during
    Name          Tenement Number                              Location            Interest           quarter
 Chapudi          Albert 686 MS                                Limpopo~              74%
 Project*
                  Bergwater 712 MS                                                   74%

                  Remaining Extent and Portion 2 of                                  74%
                    Bergwater 697 MS

                  Blackstone Edge 705 MS                                             74%

                  Remaining Extent & Portion 1 of                                    74%
                    Bluebell 480 MS

                  Remaining Extent & Portion 1 of                                    74%
                    Bushy Rise 702 MS

                  Castle Koppies 652 MS                                              74%

                  Chapudi 752 MS                                                     74%

                  Remaining Extent, Portions 1, 3 & 4                                74%
                    of Coniston 699 MS

                  Driehoek 631 MS                                                    74%

                  Remaining Extent of Dorps-rivier                                   74%
                    696 MS

                  Enfield 512 MS (consolidation of                                   74%
                     Remaining Extent of Enfield 474
                     MS, Brosdoorn 682 MS &
                     Remaining Extent of Grootvlei
                     684 MS)

                  Remaining Extent and Portion 1 of                                  74%

                  Grootboomen 476 MS                                                 74%

                  Grootvlei 684 MS                                                   74%

                  Kalkbult 709 MS                                                    74%
                                                                      Change
Project                                                                 during
   Name   Tenement Number                       Location   Interest    quarter
          Remaining Extent, Remaining                        74%
             Extent of Portion 2, Remaining
             Extent of Portion 3, Portions 1,
             4, 5, 6, 7 & 8 of Kliprivier 692
             MS

          Remaining Extent of Koodoobult                    74%
            664 MS

          Koschade 657 MS (Was Mapani Kop                   74%
             656 MS)

          Malapchani 659 MS                                 74%

          Mapani Ridge 660 MS                               74%

          Melrose 469 MS                                    74%

          Middelfontein 683 MS                              74%

          Mountain View 706 MS                              74%

          M'tamba Vlei 654 MS                               74%

          Remaining Extent & Portion 1 of                   74%
            Pienaar 635 MS

          Remaining Extent & Portion 1 of                   74%
            Prince's Hill 704 MS

          Qualipan 655 MS                                   74%

          Queensdale 707 MS                                 74%

          Remaining Extent & Portion 1 of                   74%
            Ridge End 662 MS

          Remaining Extent & Portion 1 of                   74%
            Rochdale 700 MS

          Sandilands 708 MS                                 74%

          Portions 1 & 2 of Sandpan 687 MS                  74%

          Sandstone Edge 658 MS                             74%

          Remaining Extent of Portions 2 & 3                74%
            of Sterkstroom 689 MS

          Sutherland 693 MS                                 74%
                                                                            Change
Project                                                                       during
   Name      Tenement Number                      Location      Interest     quarter
             Remaining Extent & Portion 1 of                      74%
                Varkfontein 671 MS

             Remaining Extent, Portion 2,                         74%
               Remaining Extent of Portion 1 of
               Vastval 477 MS

             Vleifontein 691 MS                                   74%

             Ptn 3, 4, 5 & 6 of Waterpoort 695                    74%
                MS

             Wildebeesthoek 661 MS                                74%

             Woodlands 701 MS                                     74%

Kanowna      M27/41                               Coolgardie^   Royalty<>
West &
             M27/47                                             Royalty<>
Kalbara
             M27/59                                             Royalty<>

             M27/72,27/73                                       Royalty<>

             M27/114                                            Royalty<>

             M27/196                                            Royalty<>

             M27/181                                             5.99%

             M27/414,27/415                                     Royalty<>

             P27/1826-1829                                      Royalty<>

             P27/1830-1842                                      Royalty<>

             P27/1887                                           Royalty<>

Abbotshall   ML63/409,410                         Norseman^      Royalty
Royalty

Kookynie     ML40/061                             Leonora^       Royalty
Royalty
             ML40/135,136                                        Royalty

Makhado      Fripp 645 MS                         Limpopo~        67%#
Project
             Lukin 643 MS                                         67%#

             Mutamba 668 MS                                       67%#

             Salaita 188 MT                                       67%#
                                                                      Change
Project                                                                 during
   Name    Tenement Number                      Location   Interest    quarter
           Tanga 849 MS                                      67%#

           Daru 889 MS                                      67%#

           Windhoek 900 MS                                  67%#

Generaal   Beck 568 MS                          Limpopo~    74%
Project*
           Bekaf 650 MS                                     74%

           Remaining Extent & Portion 1 of                  74%
             Boas 642 MS-

           Chase 576 MS                                     74%

           Coen Britz 646 MS                                74%

           Fanie 578 MS                                     74%

           Portions 1, 2 and Remaining Extent               74%
              of Generaal 587 MS

           Joffre 584 MS                                    74%

           Juliana 647 MS                                   74%

           Kleinenberg 636 MS                               74%

           Remaining Extent of Maseri Pan                   74%
             520 MS

           Remaining Extent and Portion 2 of                100%
             Mount Stuart 153 MT

           Nakab 184 MT                                     100%

           Phantom 640 MS                                   74%

           Riet 182 MT                                      100%

           Rissik 637 MS                                    100%

           Schuitdrift 179 MT                               100%

           Septimus 156 MT                                  100%

           Solitude 111 MT                                  74%

           Stayt 183 MT                                     100%

           Remaining Extent & Portion 1 of                  100%
             Terblanche 155 MT
                                                                       Change
Project                                                                  during
   Name    Tenement Number                       Location   Interest    quarter
           Van Deventer 641 MS                                74%

           Wildgoose 577 MS                                  74%

Mopane     Ancaster 501 MS                       Limpopo~    100%
Project*
           Banff 502 MS                                      74%

           Bierman 599 MS                                    74%

           Cavan 508 MS                                      100%

           Cohen 591 MS                                      100%

           Remaining Extent, Portions 1 & 2 of               74%
             Delft 499 MS

           Dreyer 526 MS                                     74%

           Remaining Extent of Du Toit 563                   74%
             MS

           Faure 562 MS                                      74%

           Remaining Extent and Portion 1 of                 74%
             Goosen 530 MS

           Hermanus 533 MS                                   74%

           Jutland 536 MS                                    100%

           Krige 495 MS                                      74%

           Mons 557 MS                                       100%

           Remaining Extent of Otto 560 MS                   74%
             (Now Honeymoon)

           Remaining Extent & Portion 1 of                   74%
             Pretorius 531 MS

           Schalk 542 MS                                     74%

           Stubbs 558 MS                                     100%

           Ursa Minor 551 MS                                 74%

           Van Heerden 519 MS                                74%

           Portions 1, 3, 4, 5, 6, 7, 8, 9,                  74%
              Remaining Extent of Portion 10,
              Portions 13, 14, 15, 16, 17, 18,
                                                                           Change
Project                                                                      during
   Name     Tenement Number                          Location   Interest    quarter
               19, 20, 21, 22, 23, 24, 26, 27, 29,
               30, 35, 36, 37, 38, 39, 40, 41, 44,
               45, 46, 48, 49, 50, 51, 52 & 54 of
               Vera 815 MS

            Remaining Extent of Verdun 535                       74%
              MS

            Voorburg 503 MS                                      100%

            Scheveningen 500 MS                                  74%

Uitkomst    Portion 3 (of 2) of Kweekspruit No.      KwaZulu-    84%
Colliery       22                                      Natal~
and         Portion 8 (of 1) of Kweekspruit No.                  84%
prospects      22
            Remainder of Portion 1 of Uitkomst                   84%
               No. 95
            Portion 5 (of 2) of Uitkomst No. 95                  84%

            Remainder Portion1 of Vaalbank                       84%
               No. 103
            Portion 4 (of 1) of Vaalbank No. 103                 84%

            Portion 5 (of 1) of Vaalbank No. 103                 84%

            Remainder of Portion 1 of                            84%
               Rustverwacht No. 151
            Remainder of Portion 2 of                            84%
               Rustverwacht No. 151
            Remainder of Portion 3 (of 1) of                     84%
               Rustverwacht No. 151
            Portion 4 (of 1) Rustverwacht                        84%
               No.151
            Portion 5 (of 1) Rustverwacht No.                    84%
               151
            Remainder of Portion 6 (of 1) of                     84%
               Rustverwacht No. 151
            Portion 7 (of 1) of Rustverwacht No.                 84%
               151
            Portion 8 (of 2) of Rustverwacht No.                 84%
               151
            Remainder of Portion 9 (of 2) of                     84%
               Rustverwacht No. 151
            Portion 11 (of 6) of Rustverwacht                    84%
               No. 151
            Portion 12 (of 9) of Rustverwacht                    84%
               No. 151
                                                                       Change
Project                                                                  during
   Name   Tenement Number                        Location   Interest    quarter
          Portion 13 (of 2) of Rustverwacht                   84%
             No. 151
          Portion 14 (of 2) of Rustverwacht                  84%
             No. 151
          Portion 15 (of 3) of Rustverwacht                  84%
             No. 151
          Portion 16 (of 3) of Rustverwacht                  84%
             No. 151
          Portion 17 (of 2) of Rustverwacht                  84%
             No. 151
          Portion 18 (of 3) of Waterval No.                  84%
             157
          Remainder of Portion 1 of Klipspruit               84%
             No. 178
          Remainder of Portion 4 of Klipspruit               84%
             No. 178
          Remainder of Portion 5 of Klipspruit               84%
             No. 178
          Portion 6 of Klipspruit No. 178                    84%

          Portion 7 (of 1) of Klipspruit No.                 84%
             178
          Portion 8 (of 1 )of Klipspruit No.                 84%
             178
          Portion 9 of Klipspruit No. 178                    84%

          Remainder of Portion 10 (of 5) of                  84%
             Klipspruit No. 178
          Portion 11 (of 5) of Klipspruit No.                84%
             178
          Portion 13 (of 4) of Klipspruit No.                84%
             178
          Remainder of Portion 14 of                         84%
             Klipspruit No. 178
          Portion 16 (of 14) of Klipspruit No.               84%
             178
          Portion 18 of Klipspruit No. 178                   84%

          Portion 23 of Klipspruit No. 178                   84%

          Remainder of Portion 1 of                          84%
            Jackalsdraai No. 299
          Remainder of Jericho B No. 400                     84%

          Portion 1 of Jericho B No. 400                     84%

          Portion 2 of Jericho B No. 400                     84%
                                                                                              Change
    Project                                                                                     during
       Name        Tenement Number                         Location          Interest          quarter
                   Portion 3 of Jericho B No. 400                              84%

                   Remainder of Jericho C No. 413                              84%

                   Portion 1 of Jericho C No. 413                              84%

                   Remainder of Portion 1 of Jericho A                         84%
                      No. 414
                   Remainder of Portion 2 (of 1) of                            84%
                      Jericho A No. 414
                   Portion 3 (of 1) of Jericho A No. 414                       84%

                   Portion 4 (of 1) of Jericho A No. 414                       84%

                   Portion 5 (of 2) of Jericho A No. 414                       84%

                   Portion 6 (of 1) of Jericho A No. 414                       84%

                   Margin No. 420                                              84%

    Vele           Portions of Overvlakte 125 MS           Limpopo~            100%
    Colliery          (Remaining Extent, 3, 4, 5, 6, 13,
    and               14)
    prospects
                   Bergen Op Zoom 124 MS                                       100%

                   Semple 155 MS                                               100%

                   Voorspoed 836 MS                                            100%

                   Alyth 837 MS                                                100%

* Form part of the Greater Soutpansberg Projects

~ Tenement located in the Republic of South Africa

^ Tenement located in Australia
#
     MC Mining's interest will reduce to 67% on completion of the 26% Broad Based Black Economic
     Empowerment (BBBEE) transaction

<> net smelter royalty of 0.5%

Date: 31-01-2025 10:45:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.